MRT Blue Line Project,Tha Phra to Lak Song, Contract 4


Bangkok, Thailand

Owner:

Ministry of Transport /Mass Rapid Transit Authority of Thailand (MRTA)

Project:

MRT Blue Line Project,Tha Phra to Lak Song Section,Contract 4

Engineer:

CSCBL  Consortium

Main Contractor:

Sino-Thai Engineering & Construction Public Co., Ltd.

Foundation Contractor:

Thai Bauer Co.,Ltd. And other

Scope of Works:

 

 

 

 

 

 

·       Bored pile dia. 800 mm. x 55 m. Depth = 78 piles

·       ored pile dia. 1000 mm. x 55 m. Depth = 4 piles

·       Bored pile dia. 1200 mm. x 55 m. Depth = 88 piles

·        Bored pile dia. 1500 mm. x 55 m. Depth = 198 piles

·       Bored pile dia. 1800 mm. x 55 m. Depth = 76 piles

·       Barrette pile 800 x 2700 mm. x 55 m. Depth = 112 piles

·        Barrette pile 1000 x 3000 mm. x 55 m. Depth = 2 piles

Construction Period:

Feb. 2012 – Dec 2012

Main Equipment:

2  nos of BG 24 ,1 no of BG 28, 2 nos of Hydraulic Grab, 2 nos of 80 ton crawler crane and 3 nos of 70 t crawler crane