Mae Moh Power Plant Replacement Unit 4-7 Project


Lampang, Thailand

Owner:

Electricity Generating Authority of Thailand

Project:

Mae Moh Power Plant Replacement Unit 4-7 Project

Engineer:

Alstom Thailand Co.,Ltd and Back & Vitch Co.,Ltd.

Main Contractor:

Marubeni Thailand Co.,Ltd./Nawarat Patanakarn Public Co.,Ltd.

Foundation Contractor:

Thai Bauer Co.,Ltd.

Scope of Works:

·         2,551 nos of Bored pile Dia.600 mm.x 13-20 m. Depth.

·         805 nos of Bored pile Dia.800 mm.x 18-22 m. Depth.

·         5 nos of Bored pile Dia.1000 mm.x 20 m. Depth.

·         958 nos of Bored pile Dia.1200 mm.x 18-30 m. Depth.

·         46 nos of Bored pile Dia.1500 mm.x 30-45 m. Depth

Construction Period:

Jan 2015 – Apr  2016

Main Equipment:

4 no.of BG 24 & BG 25 &  6 no.of 50-70 ton crawler crane.