Motorway Route No.6 – Section 29 & 30 Project


Nakhon Ratchasima, Thailand

Owner:

Department of Highway (DOH)

Project:

Motorway Route No.6 (Section 29 & 30) Project

Engineer:

MAA Consultant Co.,Ltd & Tesco Ltd.

Main Contractor:

Boonchai Panish(1979) Co.,Ltd.

Foundation Contractor:

Thai Bauer Co.,Ltd and Others.

Scope of Works:

·           12 nos of Bored pile Dia.1200 mm.x 26 m.in soil and 6 m rock socket.

·           216 nos of Bored pile Dia.1500 mm.x 13-21 m. in soil and 6-9 m rock socket.

·           148 nos of Bored pile Dia.1800 mm.x13-20 m. in soil and 10-11 m rock socket.

Construction Period:

Jan 2017 – Nov 2017

Main Equipment:

2 no.of BG 40 &  2 no.of 70 ton crawler crane